Scope of Services

The scope of the project included a soft (interior) demo of the hospital auditorium and a structural demolition of the hospital auditorium. The Vobecky team completed the soft (interior) demo of hospital clinical (V bldg.) and the roof tear off hospital clinic (V Bldg.). The team performed hard separation of the hospital clinic. The clinic was to be demolished and separated from the live portion of the hospital. Protection was installed as needed to adjacent areas.

An ultra-high reach excavator was assembled. Execution of the site included removal of hardscape to allow site movement and assembly of ultra-high reach excavator as directed and project mobilization. This was all done without any interruption to the daily activities of the hospital.